Newmont Akyem Mine Infrastructure Construction
Eastern Region, Ghana
Two greenfield Tailings Storage Facility constructions (Stage 1 & Stage 6) and one brownfield downstream raise (Stage 5). Works included: vegetation clearing/grubbing; topsoil stripping and stockpiling; unsuitable materials removal; basin foundation preparation; dam wall/embankment fills; basin drainage system (below & over liner) construction; and monitoring instruments installations.