Newmont Akyem Mine Infrastructure Construction
Eastern Region, Ghana
Greenfield Tailings Storage Facility Stage 1 construction. Works included: vegetation clearing/grubbing; unsuitable materials removal; topsoil stripping and stockpiling; basin foundation preparation; dam wall/embankment fills; basin drainage system (below & over liner) construction; and monitoring instruments installations.