Decant Tower 8 Construction – Pool Migration
Ahafo South, Ghana
Excavation of outstanding soil materials and stockpiling for reuse, compaction to 2m depth, backfilling with rocks, and construction of seepage drains, concrete culverts and vibratory wire piezometers to stabilise the ground from the 150MT to 190MT embankment toe.